Cart

No products

Shipping $0.00
Total $0.00

Cart Check out

ISO 18828-2:2016

ISO 18828-2:2016

Industrial automation systems and integration — Standardized procedures for production systems engineering — Part 2: Reference process for seamless production planning

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$57.60

$144.00

(price reduced by 60 %)

ISO 18828-2:2016 describes a reference planning process for seamless production planning.
The scope of the discussed reference process focusses on the planning of production systems such as make-to-stock or assemble-to-order production. The analysis of the process activities has been limited to those within the production planning. The following aspects are within the scope of ISO 18828-2:2016:
· general overview of the reference planning process,
· basic principles of the process model,
· description of each level identified within the reference planning process for production planning,
· structure of activities and relations within each planning discipline,
· dependencies of interdisciplinary activities.
The following items are outside the scope of ISO 18828-2:2016:
· material requirement planning/manufacturing resource planning,
· production order control,
· production process,
· early stage product design,
· order management, inventory management, purchasing, transportation, warehousing,
· production facilities planning/manufacturing facilities planning (physical plant and equipment), including any kind of resource that is not directly related to the manufacturing process,
· value chain (inbound logistics, operations management, outbound logistics, marketing and sales),
· resource visualization,
· process simulation.

Contact us