Cart

No products

Shipping $0.00
Total $0.00

Cart Check out

SAE EDIB 1B:2016-05-31

SAE EDIB 1B:2016-05-31

SAE EDIB 1B:2016-05-31

Unit Production Cost Tracking Model UPCT 6 (Stabilized: May 2016)

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$36.74

$91.84

(price reduced by 60 %)

This userguide contains a description of the Unit Production Cost Tracking Model for use in design tradeoffs and control and reporting tasks of a Design-to-Cost program. This model is designed to compare two Cost Breakdown Structures (CBS) to show elemental and summary cost differences. The two Cost Breakdown Structures may represent design alternatives, or a target allocation and the current design approach for comparison.

Contact us