BPVC-CC-NUC-2019 contains provisions which have been adopted by the Boiler and Pressure Vessel Committee that cover Section III, Divisions 1 and 2, and Section XI to provide, when the need is urgent, rules for materials or constructions not covered by existing Code rules.