This technical report covers the installation and dryout of monolithic refractory lining materials for Hydrocarbon Processing Industry (HPI) applications. It discusses the best practice procedures and techniques used in the
installation of refractory concrete, as well as those for air and heat setting plastics and ramming mixes. In addition, it addresses the need for curing and dryout procedures to achieve successful results. This instruction is consistent with API Standard 936, which is the HPI industry standard for the installation quality
control of monolithic refractories.