Cart

No products

Shipping $0.00
Total $0.00

Cart Check out

IEC 61850-7-410:2012+AMD1:2015 Edition 2.1

IEC 61850-7-410:2012+AMD1:2015 Edition 2.1

IEC 61850-7-410:2012+AMD1:2015 (Consolidated version) Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$223.20

$558.00

(price reduced by 60 %)

IEC 61850-7-410:2012+A1:2015 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010,
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated,
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant. THIS CONSOLIDATED VERSION CONSISTS OF THE SECOND EDITION (2012) AND ITS AMENDMENT 1 (2015). THEREFORE, NO NEED TO ORDER AMENDMENT IN ADDITION TO THIS PUBLICATION.

Contact us